Interior partitions
Lay out and build non-load-bearing partitions around the confirmed room plan and required openings.
Straight walls, well-planned openings and properly installed board create the foundation for every finish that follows. Real Finish approaches framing and drywall with the final surface in mind.

Layout, openings, backing, service locations, board selection and joint placement all affect the next trade. Reviewing those details early creates a cleaner path from framing to taping, paint, trim and flooring.
Lay out and build non-load-bearing partitions around the confirmed room plan and required openings.
Create or repair ceiling planes and enclosures around the actual project conditions and specified services.
Frame clear, aligned openings and coordinate the backing or supports the finished installation requires.
Add support for planned cabinetry, fixtures, handrails or mounted elements before walls are closed.
Install board with attention to layout, seams, corners, openings and the finish level that will follow.
Assess damaged walls and ceilings, then match repair preparation to the surrounding surface and coating.

Open walls are the time to confirm services, backing, openings and specified assemblies. Closing too early can create rework or compromise the finish, so the sequence should reflect inspections and other trade requirements.
A connected plan brings the work, responsibilities and sequence together—before the finishing starts.
Careful framing supports cleaner room lines, openings and transitions.
Board placement and joint planning give the taping stage a stronger foundation.
Backing, openings and service locations can be checked before walls are closed.
Public reviews specifically reference framing, drywall installation, drywall preparation, Level 5 finishing, ceilings and repair work by Real Finish Renovations.
Start with photos, your location and the changes you have in mind. Review the conditions and define the work before construction begins.
Send the location, property type, affected areas, photos and intended outcome.
Assess access, existing conditions, removals, finish expectations and known requirements.
Clarify inclusions, exclusions, trade interfaces and any drawing or approval needs.
Complete the agreed work and review the finish against the defined scope.
What to know before you begin. Project-specific details are confirmed after reviewing the property and proposed work.
Structural changes require appropriate review, drawings and approvals before work begins. They should not be treated as ordinary partition framing.
It adds a skim coat over the drywall surface to create a more uniform appearance under strong lighting, dark paint or other critical viewing conditions.
Yes. Wall and ceiling repairs can be assessed alongside the surrounding finish, damage cause and desired coating.
Board selection depends on location and specification. Moisture, fire, impact, sound and other requirements may affect the appropriate assembly.
Send photos, room details and any drawings or specifications available.